Lean System and Innovation
Lean thinking (Toyota Production System; Womack and Jones) · Ohno's seven wastes · 5S · Just-in-time and back-flushing · Kaizen costing · Total productive maintenance and overall equipment effectiveness (Nakajima) · Cellular manufacturing and rank order clustering (King's algorithm) · Six Sigma: DPMO, DMAIC and DMADV, Lean Six Sigma · Process innovation
The lean toolkit taught as one system. The chapter starts with lean thinking, the five lean principles, Ohno's seven wastes and 5S, then covers just-in-time purchasing and production with a JIT cost-benefit analysis, back-flushing and its problems, and kaizen costing with monthly targets and gaps. It goes on to total productive maintenance, its eight pillars and the computation of overall equipment effectiveness from the six big losses; cellular manufacturing and rank order clustering; and Six Sigma, including DPMO and sigma levels, DMAIC and DMADV, its limitations and Lean Six Sigma, ending with process innovation.
The lessons in this chapter
- Lean thinking, the seven wastes and 5S9 min
- Just-in-time: initiatives, features and cost impact8 min
- Back-flushing in a JIT system7 min
- Kaizen costing7 min
- Total productive maintenance and overall equipment effectiveness9 min
- Cellular manufacturing and one-piece flow8 min
- Six Sigma, Lean Six Sigma and process innovation9 min
Each lesson gives the rule in plain language, then the provision, a table where there are limits to remember, and an everyday example.
Practice for this chapter
20 flashcards, 30 MCQs, 5 case questions, 5 solved problems. Every answer comes with its reason, and a wrong answer waits in your mistake book until you get it right. A one-page revision sheet gathers what to carry into the exam.
Start with a free chapter
Create a free account and read Chapter 1, “An Introduction to Strategic Cost Management”, of Strategic Cost and Performance Management today, with its lessons, flashcards and questions.